Making more houses and Searching for Sites
Construction Day Numero Uno
We headed back to the beach and put together the frames around the varilla that had been welded together. We cut 1.3 m lengths of the 1/8” varilla and tied them to the frames with alambre dulce. Eight were tied on lengthwise and four were bent and tied on horizontally. We got a lot of help from the kids.
We also cut all of the boards that we would need to construct the frames the next day.
Then we laid out the tarp on the flattest ground available that was right in front of the bar. There was enough space for seven casitas and we gathered together scraps of lona that were conveniently clinging to Fran’s roof and some cardboard that was laying around and placed the three remaining casitas we constructed the wooden frames to put around the welded varilla. There were two pieces that went lengthwise that were approximately 1.4 m long. The inside pieces were trimmed so that they wouldn’t hang over the outside pieces. We used wood that was 1 x 10 x 14 ft. The trimmed part we were planning to use to cover the ends but we realized that we would need more than one nail to make cover the cement coming out of the sides so we had to cut more boards. We only ended up making 10 frames because the wood is the most expensive investment in making the houses and can be reused a day after the houses are made. The nails are removed and the boards peeled off. The houses still are not dry enough to be moved though. That can happen after two days, as we found out since we had to prop up some of the houses to make the final three.
Monday, July 26, 2010
Making the Frames
Sunday, July 25, 2010
Construction Craziness!
Thursday, July 22, 2010
Planning for the Big Construction
This morning it took me two hours to print off the avisos we are going to hang up at the pescaderias and the beaches where the fishermen bring in their catch. The avisos tell the fishermen not to fish inside an area marked with red buoys because it is part of a scientific study. We have the support of CODOPESCA, SEMARENA, and the Marina de Guerra, so if anyone sees someone disturbing the houses, they are to call the numbers on the flyer. The first time I went to print out the avisos, PyP, the business that we also buy our wireless from, was closed. The second time they had run out of yellow ink and said that they wouldn't be able to get more ink until Monday or Tuesday. The aviso still prints in color and the red shows up, which is the most important component, but it looks weird. After consulting with Darien, we decided to go with the aviso in color over the black and white.
We've bargained with a local welder named Ale to weld the frames together before the workshop so that they will be ready. He started off asking for 500 pesos per house but we were able to get it down to 300 pesos per house, which is still a lot of money at $US 166. Today we are hopefully going to buy the materials and bring them to his house. I went to the ferreteria at 1 but it was closed like all of the other businesses in Miches for the lunch hour (12-2). So I'm going to have to go try again. Hopefully, they are open tomorrow as well, or else we are going to have to buy all of the materials today and bring them to Frank's house. Hopefully the rain will cease by then because I don't think concrete likes getting wet.
Frank is the fisherman who is going to monitor the lobster houses for me. He is going to get possession of the lobster houses when the project is over and will be able to collect the legally harvestable lobsters from the houses during the project while he's collecting the data. He is the one who rents all of the fishing equipment to the majority of the fishermen of los Mameyes, hopefully out of respect for him and the chance that they might receive lobster houses of their own from the project if they are successful, they won't disturb the lobster houses. Frank also owns a bar where the lobster information session will be held and we are going to construct the houses on top of his roof.
Yesterday I went to the beach with Darien and Coral to collect bottle caps to help distinguish the houses from each other. Six bottlecaps will be placed into the concrete while it's drying and have a pattern of one or two different colors. I never realized how many different colored bottlecaps there are but there are enough for 20 different color combinations, enough for our 20 houses! We got three fishermen from the beach located by the basketball field to help us. They were part of the fishermen's group headed by Pompilio. Last year Pompilio fished for lobsters but this year he stopped. I still have to ask Carlos why that is...
Friday, June 11, 2010
Lesson in Crustacean Architecture

Here’s a photo of two female lobsters with eggs

Fun fact: One lobster can have as much as 50,000 to 1.7 million eggs.
Here's a photo of a lobster house after it has been put into the water. The lobster houses are made from cement, which is partially made from limestone (the same material that corals are made of) and provide a substrate for marine life besides providing shelter for lobsters.

Here are the dimensions for the lobster houses (Sorry about the Spanish and the tiny font)
The lobster houses are made from a wire frame that is welded together and a wire mesh is put on top. Then a wooden frame is added around it and the insides and it is filled with cement. It takes 3-5 days to dry.

Then, the lobster houses are sunk in an area ideally located close to a coral reef, which is where lobsters like to feed during the day, and where there is a hard bottom, which would prevent sand from filling up the lobster house. A GPS is used to mark the locations of the lobster houses because if buoys are used, the houses are susceptible to lobster piracy. To reach the lobster houses, the fishermen either snorkel or SCUBA dive. The houses can be one to 30 meters deep. Two fishermen dive down to the house, one lifts up one end of the lobster house while the other scoops up the lobsters with a jamo. Since the lobsters are afraid of the light they cluster at the back of the house instead of trying to swim away. The lobsters are brought up the surface and only the legal lobsters are kept.